Project Overview
MEP design and turnkey execution for the heavy industrial manufacturing facility of TB. Handled high-power sub-panels, process cooling pipelines for heavy machinery, emergency exhaust ventilation systems, and hazard-certified fire suppression hydrants.
Scope of Work
Substation and Transformer installation.
HT & LT Panels and Cable routing.
Mechanical ventilation & smoke extraction systems.
Process cooling loops and piping configurations.
Key Challenges
Managing extreme ambient heat and hazardous fumes inside turbine assembly halls during production peaks.
Our Solutions
Designed high-volume exhaust stacks paired with intelligent heat-recovery ventilation (HRV) units, reducing cooling power draw by 22%.
Project Gallery



Client Information
Client NameTB
LocationCuttack, Odisha
StatusCompleted
Year Completed2022
Project Statistics
15 MVA
Substation Load
120,000 CFM
Air Flow Rate
8 Units
Exhaust Stacks
Services Provided
- HT Substation & Power distribution engineering.
- HVAC Ventilation & Process cooling loops.
- Turnkey Plumbing & Public Health Engineering.