Project Overview

MEP design and turnkey execution for the heavy industrial manufacturing facility of TB. Handled high-power sub-panels, process cooling pipelines for heavy machinery, emergency exhaust ventilation systems, and hazard-certified fire suppression hydrants.

Scope of Work

Substation and Transformer installation.
HT & LT Panels and Cable routing.
Mechanical ventilation & smoke extraction systems.
Process cooling loops and piping configurations.

Key Challenges

Managing extreme ambient heat and hazardous fumes inside turbine assembly halls during production peaks.

Our Solutions

Designed high-volume exhaust stacks paired with intelligent heat-recovery ventilation (HRV) units, reducing cooling power draw by 22%.

Project Gallery

Project gallery frame 1
Project gallery frame 2
Project gallery frame 3

Client Information

Client NameTB
LocationCuttack, Odisha
StatusCompleted
Year Completed2022

Project Statistics

15 MVA

Substation Load

120,000 CFM

Air Flow Rate

8 Units

Exhaust Stacks

Services Provided

  • HT Substation & Power distribution engineering.
  • HVAC Ventilation & Process cooling loops.
  • Turnkey Plumbing & Public Health Engineering.